Quotation Notice - Providing & Installation of CCTV Surveillance at PAU-College of Agriculture, Ballowal Saunkhri. (Last date of submission of quotations 02-12-2024 upto 03.00 PM)

PUNJAB AGRICULTURAL UNIVERSITY, LUDHIANA
PAU-College of Agriculture, Ballowal Saunkhri

QUOTATION NOTICE

Quotations on plain papers are invited on the basis of overall percentage below/Overall percentage above/At Par & Item rate for NS items from the approved & eligible Contractors/firms enlisted with PAU/PWD/Railways & other public sector undertakings of the appropriate class for the following work(s). Quotations should reach in the office of the undersigned up to 03:00 P.M. on or before 02.12.2024. The same will be opened on 04.12.2024 at12.30P.M. in the Committee room Dean College of Agriculture, PAU Ludhiana, of only those firms/contractors, who will be found eligible.

Sr. No.

Name of the work

Estimated Cost (Amount in Rs.)

Time Limit

1

Providing & Installation of CCTV Surveillance at PAU-College of Agriculture, Ballowal Saunkhri.

4,98,423/-

1 month

Terms and Conditions

(Providing & Installation of CCTV Surveillance)

  1. Conditional/unsealed/telegraphic/incomplete quotations shall not be accepted.
  2. Quotations of only those contractors/firms should be accepted who quote their rates in the following format.

:CSR Items

Name of the firm/Contractor

Sr. No.

Option

%age in figures In words

Amount (Rs.)

1.

Overall Percentage below

2.

Overall Percentage above

3.

At par

Note: Only one of the above options is to be filled. More than one option shall be rejected.

(B): Non-Scheduled items:

Rates for non-scheduled items only and these must be mentioned in figures as well as in words.

Sr. No.

Description of item

Rate

Unit

Amount (Rs.)

Rate(s) quoted in any other format/form in respect of (A) & (B) above shall be rejected. After working out overall amount on the basis of rates quoted by contractors/firms for (A) and (B), the lowest bidder shall be arrived at.

  1. The drawings/estimate/sketched & other relevant papers can be seen in the office of Xen. Electrical, PAU on any working day from 3:00 p.m. to 5:00 p.m.
  2. The copy of the estimate can also be seen in room of undersigned.
  3. The quotations should be valid for at least 90 days from the date of opening.
  4. The Technical bid and Price bid should be sealed in two different envelopes (clearly written on envelopes "Technical bid envelope" & "Price Bid Envelope"). Both these envelopes should be put in another envelope in the name Dean, PAU-College of Agriculture Ballowal Saunkhri clearly mentioning on top of the envelope in the name of the work for which technical bid and price bid is quoted.
  5. The Technical bid should include GST, PAN, ESI and EPF documents. In case the required documents are not attached with the quotation then the quotation of the contractor/firm will be rejected.
  6. As the above-mentioned work is a specialized job, the enlistment with any Govt. agency & Govt. electrical inspection certificate is exempted in place that similar nature of work should be considered for quotations participation and should be attached with technical bid.
  7. The terms & conditions are clear and unambiguous. If any doubt or obscurity as to the meaning of quotation documents, location of site and drawing etc. must be got clarified in regard to such doubt or obscurity before submitting the quotation.
  8. The Quotation Opening Committee reserves the right to reject any or all the quotations without assigning any reason thereof.
  9. If the date of opening of quotations is declared as a public holiday then the quotations will be opened on the next working day on the same time, terms & conditions.
  10. Quantities given in the estimate are tentative and can be increased/decreased to any extent or can be totally omitted according to actual requirements at site by the committee & the contractor shall have no claim on this account.
  11. Payment of work done shall be remitted to the contractor/firm in single bill (1st & final bill) after the monitoring committee gives a certificate regarding satisfactory completion of work.
  12. Work will be started by the contractor/firm within 10 days from the date of issue of the work order. In case the firm/executive agency do not start the work within the prescribed period, no further correspondence in this regard will be made with the contractor to start/execute the work and such contractor shall be held defaulter for not starting the work. Then the standing committee may allot the work to 2nd lowest eligible quote if its rates are found to be reasonable & genuine by cancelling/rescinding the allotment letter or may opt for calling quotations afresh. The defaulter contractor shall be forbidden for at least 6 months for quoting his rates for other works at PAU, Ludhiana and outstation.
  13. If the firm/executive agency does not complete the work within the stipulated time, university can levy penalty for the same.
  14. Firm/Contractors having three or more than three works of PAU (PAU Campus/Outstations) pending from more than two years after original schedule date of completion will not be eligible to participate in this quotation. On the basis of the performance of the agency/contractor/firm, PAU reserve the right to reject any/all those quotations.
  15. The Society/Contractor/Firm should have a valid email ID, which shall be kept active. In the absence of email ID, the tender may be rejected.
  16. CGST, GST, Income Tax, Labour Cess and Water Charges shall be deducted as per the prevailing rules.
  17. The firm/contractors should be registered with ESI and EPF.
  18. In case of any dispute, jurisdiction will be Ludhiana District Courts.

Dean
PAU-College of Agriculture
Ballowal-Saunkhri

Memo. No.COA/06/2024/ Date: -